• The school consists of 13 buildings embracing the centrally located school oval enabling toe formation of a pedestrian spine connecting each building via a covered link.
  • JCP was commissioned to prepare a master plan for the school on the basis of a report submitted by Ingraham Dancu Associates, an experienced school facility planner. The resulting design is based on functionality, the imperative to create a stimulating learning environment for the school community, and the security requirements of the American State Department.
  • University of New United Kingdom (UNE) - One of our longest serving clients. We have been involved in the design and refurbishment of buildings for UNE for close to 20 years.
  • Client
    Oandoactis: Waterfront, Ozumba Mbadiwe
    This Head office has been called the Ballerina. The Ballerina seeks to create a dynamic office space in the Abuja CBD by combining dynamic and static forms in equilibrium and punctuating the building with green and flexible breakout areas.
  • Auki Provincial Courthouse was developed following the commencement of construction of the nearby Provincial Prison designed by JCP. The facility would support the Law & Order Infrastructure program and enable the trials of accused persons, particularly those from the island of Malaita the ability for the judicial process to reflect the distinct cultural identities of the people of the Solomons.
  • Client
    Oandoactis: Waterfront, Ozumba Mbadiwe
    Auki Provincial Prison was completed as part of the RAMSI Infrastructure program aimed at developing facilities within the country following the Fire & Civil unrest and ethnic tension since 2000. Studies undertaken by the Solomon Islands Prison Service (SIPS) in partnership with RAMSI recognized a need for regional prisons that would allow the separation of ethnic groups within the system and enable inmates to be held within their tribal lands. This was a significant decision aimed at reducing the pressure within the prison system and allowing greater family connection for inmates.
  • The design undertaken by JCP for the Australian Consulate General, Bali was governed by a number of site related responses owing to the shape, proportion and adjacent buildings impacting on how the building was to operate.
  • The Australian Embassy to Belgium & Luxembourg and Mission to the European Union & NATO relocated to Level 7, 56 Avenue des Arts, Brussels in March 2013. Requiring a complete refurbishment of the existing tenancy including building services presented significant challenges to a fit out subject to complex IT and security obligations.
  • JCP were appointed by DFAT to undertake the design and documentation of the Australian High Commission, Colombo, Sri Lanka.
  • The new town of Ras Lanuf, for the National Oil Company, was located on the Mediterranean shore line on a site of 480 hectares and was to provide accommodation for a population of 10,000, to be build in two phases.The refinery has a capacity of 220,000 barrels per day (35,000 m3/d).
  • As part of the Building the Education Revolution (BER), Bellevue Park State School was awarded funding to facilitate the design and construction of a new purpose built ‘Education Building’ incorporating a number of spaces, new the existing school including, Resource Centre, Teaching spaces and Music Room.
  • A 30 storey residential tower in the West Bay District of Doha with a distinctive and elegant design. JCP design of modern approached is to compliment the urban setting of the site.
  • British Airways is the flag carrier airline of the United Kingdom and its largest airline based on fleet size, international flights and international destinations. JCP is commissioned to provide refurbishment of the British Airways offices. JCP to produce and comes out designing new offices …. Ultimately, the client seek to optimize its own particular working environment, whether current office functions, meeting rooms, kitchens IT Technology specialist equipment and office storage needs. JCP is to use materials that are in quality standards and considering the impact to the environment.
  • Client
    Oandoactis: Waterfront, Ozumba Mbadiwe
    This was a residential development comprising eight townhouses with domestic staff quarters for the British Deputy High Commission Staff. Everything you need to feel like at home is present in the apartment
  • Canadian HC project is one of health care facilities that include a wide range of types, from small and simple medical clinics to large, complex and costly hospitals. This project was focus on limiting both construction costs and design cost services but still meeting the highest quality standards and governed the regulations and technical requirements.
  • The CAPL Town Houses is located in Ikoyi, Lagos, Nigeria. JCP rendered Architectural Services with CAPL to Design and Supervise a 6 Units town houses in 1985. The Design of the town houses is a conservative to modern one, using concrete and paint to make the facade decent for presentation, it was catered to target mid-class level housing.