- During late 1999, an architectural competition was called for international consultants to participate for the Design of the Central Blood Bank Projects in Abu Dhabi & Al Ain Cities.
- Penthouses also differentiate themselves by luxurious amenities such as high-end appliances, finest materials fitting, luxurious flooring system, and more. JCP is commissioned to undertake the architectural design and the construction services and to meet the guests or tenants expectations as well as the applied advanced technology & process that will benefit the entire operation.
- The Chellarams Tower is located in Nigeria, it is one of the pioneering projects of James Cubitt and Partners in the country. James Cubitt and Partners rendered Architectural Design and Project Supervision, the entire project consisting of 13,000 m2. in floor areas with modern design facilities and completed in 1985.
- Chrysler Motors Limited and Cummins Engine Company formed a new company called Chrysler - Cummins Limited and a factory was to set up at Darling ton, Durham. A 30 acre facility was to be engineered to produced diesel engines. The management of Chrysler-Cummins Limited appointed James Cubitt and Partners to provide all Engineering Consultancy Services and Contruction Management of the perceived factory.
- Deliberately designed with a low-tech facade, the building is the head office of the prestigious Citibank Nigeria Limited. The primary structure consists of four office floors with a bank branch on the ground floor; a provision for an additional floor can be accommodated should the need later arise.
- The Coca Cola Head Office Residence was completed in 1997 with an approximately 3,000 m2 GFA. James Cubitt and Partners commissioned to do the Architectural Design for the said building to host Coca Cola Company's Staffs, the building structure was geometrically Square, with a simple Architectural design spaces to provide all essential elements to house the staffs. Materials was modern and yet simple with color used to be the color theme of the Coca Cola company Red and white.
- We are pleased to say we have contributed in some small way to this major capacity increase by using the cube of the assembly shop for the new NP stores and shop floor offices as well as specialist areas added, such as the new JV Test Cells, Product Development Building, Finished Goods Store and Despatch Docks, a full fire ring main and sprinkler system using Cummins engines housed in a fully glazed pump house.Located on the route taken by visitors to the facility, and new corporate branding to the office main entrance
- We provided a range of services for Cummins Ltd. in different locations, site development, architectural, building services, structural and Fire & Civil Engineering design engineering for both the main Building and its associated structures.
- Client
- Oandoactis: Waterfront, Ozumba Mbadiwe
In 1988 Cummins wished to consolidate two subsidiary companies and their European head office on to the site located at Mechelen Nord, Belgium. Working with the local architects, De Smedt & Whalley, James Cubit & Partners designed an extension to the existing offices for Head Office Personnel from Brussels, a refurbishment of the warehouse exterior and solar protection to the offices, and a new office facility and warehouse for Cummins Filtration.- Component Plant Building for Cummins Emissions Solutions, with additional test capacity for the Pilot Centre. The major changes within the building were due to product change, such as the complete internal remodelling of the Engine Plant in the 1980’s for the B & C series engines manufacturing processes and consolidation such as during the late 1990’s early 2000’s, or Health & Safety issues, welfare needs or support facilities such as in 2007 / 2008 bringing life back to the former Component Plant Building for Cummins Emissions Solutions
- In 2010 Cummins Inc. selected a Duty Free Industrial Site in Izmir, Turkey for a major factory development for Cummins Filtration and Cummins Generator Technologies. The 10 Hectare site was Master Planned by James Cubitt & Partners to be developed in 4 phases.
- Shortly after completing the designs for Wellingborough JCP were invited to prepare a Master Plan for Newage International: Stamford which outlined the future of the existing facilitydevelopment as well as an alternative proposal for a Greenfield Site just a little further along Barnack Road.As ever, development of the existing facility was selected, and a radical change to site security and commercial vehicle routes was implemented with a new employee car park separated from the factory area by a security fence, and a new gate house for the checking in and out of all commercial lorries.
- Cummins purchased the former Herbert Ingersoll Factory in Daventry for the manufacturing high horsepower engines. JCP were invited to double the footprint of the building with a new machine shop as well as the complete internal refurbishment of the existing factory as an Assembly Shop.
- Darlington had a very basic brief. There were to be two buildings one totally a glass box and the second a windowless box. We believe that this brief was conceived by Cummins and Kevin Roche who as our partner in this overall scheme, he being closer to the client and more known in America he got the plumb of the jobs, being the glass box.
- The relocated Oil Tank farm, and the provision of a new lift for the disabled in the administration building, hopefully to start some time later this year.
- James Cubitt & Partners were invited to prepare the master planning design and outline specification for this new facility. Again, great care was taken in the building design to introduce as much natural light in to the offices and warehouse / workshop areas by the introduction of a large internal landscaped courtyard which is used during the summer months by employees during their break periods.
- The Dangote House Expansion was commissioned to JCP during the 70's for the Architectural design and project supervision. The expansion plan of Dangote House will highlights the modern design and quality and standards during the execution of the project. JCP is keen to deliver the design in the most cost effective and targeted timetable.
- JCP were engaged for the the Design and documentation of 69 contemporary houses for Defence Housing Australia, on a new subdivision adjoining Brisbane’s Enoggera Military Barracks. The brief outlined a need for a more sophisticated approach to housing than that previously provided for Military personnel and their families.