Client

Cummins Daventry Plant

Location

United Kingdom

Project Sector

Industrial & Building Sector

Provided Services

Architecture, Civil Engineering, Electrical Engineering, Construction Services, Mechanical Engineering & Safety.

Project Description

We are pleased to say we have contributed in some small way to this major capacity increase by using the cube of the assembly shop for the new NP stores and shop floor offices as well as specialist areas added, such as the new JV Test Cells, Product Development Building, Finished Goods Store and Despatch Docks, a full fire ring main and sprinkler system using Cummins engines housed in a fully glazed pump house.Located on the route taken by visitors to the facility, and new corporate branding to the office main entrance.

  • 2012 Basketball Arena

    This contemporary venue is one of the largest temporary arenas constructed in the United Kingdom. It has 12,000 seats for the Paralympics wheelchair, basketball and rugby events.
  • Chrysler-Cummins

    Chrysler Motors Limited and Cummins Engine Company formed a new company called Chrysler - Cummins Limited and a factory was to set up at Darling ton, Durham. A 30 acre facility was to be engineered to produced diesel engines. The management of Chrysler-Cummins Limited appointed James Cubitt and Partners to provide all Engineering Consultancy Services and Contruction Management of the perceived factory.
  • Cummins Daventry Plant

    We are pleased to say we have contributed in some small way to this major capacity increase by using the cube of the assembly shop for the new NP stores and shop floor offices as well as specialist areas added, such as the new JV Test Cells, Product Development Building, Finished Goods Store and Despatch Docks, a full fire ring main and sprinkler system using Cummins engines housed in a fully glazed pump house.Located on the route taken by visitors to the facility, and new corporate branding to the office main entrance
  • Cummins Diesei – Willingborough

    We provided a range of services for Cummins Ltd. in different locations, site development, architectural, building services, structural and Fire & Civil Engineering design engineering for both the main Building and its associated structures.
    Cummins Diesei-Willingborough
  • Cummins Emission Solutions

    Component Plant Building for Cummins Emissions Solutions, with additional test capacity for the Pilot Centre. The major changes within the building were due to product change, such as the complete internal remodelling of the Engine Plant in the 1980’s for the B & C series engines manufacturing processes and consolidation such as during the late 1990’s early 2000’s, or Health & Safety issues, welfare needs or support facilities such as in 2007 / 2008 bringing life back to the former Component Plant Building for Cummins Emissions Solutions
  • Cummins Ltd. – Daventry

    Cummins purchased the former Herbert Ingersoll Factory in Daventry for the manufacturing high horsepower engines. JCP were invited to double the footprint of the building with a new machine shop as well as the complete internal refurbishment of the existing factory as an Assembly Shop.
  • Cummins Manufacturing Facility

    Darlington had a very basic brief. There were to be two buildings one totally a glass box and the second a windowless box. We believe that this brief was conceived by Cummins and Kevin Roche who as our partner in this overall scheme, he being closer to the client and more known in America he got the plumb of the jobs, being the glass box.
  • Cummins Pilot Centre

    The relocated Oil Tank farm, and the provision of a new lift for the disabled in the administration building, hopefully to start some time later this year.
  • Cummins Power Generator

    James Cubitt & Partners were invited to prepare the master planning design and outline specification for this new facility. Again, great care was taken in the building design to introduce as much natural light in to the offices and warehouse / workshop areas by the introduction of a large internal landscaped courtyard which is used during the summer months by employees during their break periods.
  • Ennismore Gardens

    This Grade II* listed building has been rearranged internally to the clients specific needs, whilst maintaining the traditional features of the first and second floor parlour rooms. The residence is decorated and furnished to the highest standards
  • Highgate School

    This important Private School has progressively expanded and improved its teaching and support facilities over the past 30 years. The Garner Building, located on the island site in the centre of Highgate Village, a conservation area was built to the highest material standards with maximum visibility to the village street scene, comprising 7 classrooms, a staff tutorial, a teaching workshop and a computer classroom.
  • Roche Pharmaceutical Products

    James Cubitt & Partners have master planned facilities both in the United Kingdom and Nigeria for Roche Pharmaceutical Products. Their Welwyn Garden City site accommodates their head office, research laboratories, manufacturing facility and automated distribution packaging centre, including employee welfare facilities. Over 1,000 employees are located on site.
  • Roche Pharmaceutical Products

    Over 1,000 employees are located on site. JCP have also designed the Roche Factory in Dalry, Scotland. The site in Dalry manufactures vitamin treatments comprising manufacturing and distribution buildings, associated offices and employee welfare facilities. The site was a greenfield site and has been landscaped to a high standard.
    Roche Pharmaceutical Products
  • St Catharine’s & Kings College

    James Cubitt & Partners has, during the past 39 years, developed the site in several phases to accommodate 200 student en-suite bedrooms, a large central kitchen and dining hall, a junior common room and a student library.
    St Catharine’s & Kings College
  • St Catharine’s College & Kings College Cambridge

    The Island site in the centre of Cambridge is jointly owned by the two colleges. James Cubitt & Partners have, during the past 39 years, developed the site in several phases to accommodate 200 student en-suite bedrooms, a large central kitchen and dining hall, a junior common room and a student library.
    Majestic Residential Tower
  • St Chads Development: Cambridge

    The grounds of a listed house owned by the college were chosen as the site for an additional 130 student bedrooms and eating facilities located on the outskirts of Cambridge. The Development, completed to date in three phases, comprises a chain of octagonal towers each containing a study bedroom with communal kitchen and welfare facilities.
    St Chads Development
  • St. Chad’s Development West Road of St. Catharine’s College

    James Cubitt & Partners were commissioned by St. Catharine’s college in the 1970’s to design residential accommodation in the grounds of St. Chad’s, a prominent Victorian villa.