JCP were appointed to reinvigorate and refurbish the Main Entry, Staff Areas, E-Learning Commons, Reserve Collection and Ground Floor of the existing Dixson Library building. Constructed in 3 stages through the 1960s-70s, the Dixson Library building had poor natural light, low ceilings and space planning ill suited to contemporary learning practices.