We are pleased to say we have contributed in some small way to this major capacity increase by using the cube of the assembly shop for the new NP stores and shop floor offices as well as specialist areas added, such as the new JV Test Cells, Product Development Building, Finished Goods Store and Despatch Docks, a full fire ring main and sprinkler system using Cummins engines housed in a fully glazed pump house. Located on the route taken by visitors to the facility, and new corporate branding to the office main entrance.